History
Position : Home > About us > History

In 2010, the R&D and production trial of the gas booster pump was successful, and Stech entered the gas booster pump industry and achieved the breakthrough of the first domestic gas booster;

Date:2017-03-01 10:12:55    Visits:

In 2010, the R&D and production trial of the gas booster pump was successful, and Stech entered the gas booster pump industry and achieved the breakthrough of the first domestic gas booster;

Copyright © 2012-2021 Shenzhen Siteke Pneumatic Hydraulic Co., Ltd. Copyright         粤ICP备15051776号

0755-27967320

Siteke